# #PROJECT — build a project around #RESEARCH

**Contract:** `dot-research-project/2`
**Requires:** `#AGENT`, `#STORAGE`, and `#PROGRESS`
**Purpose:** create, control, recover, and complete one bounded research project.

## PROJECT-001 — Establish the project

Do not begin an unfilled topic. Create a Project Control Packet using the
corresponding `#TEMPLATE` and resolve every field that materially affects
permission, scope, evidence, or acceptance:

- stable project ID and version;
- master question, supported decision, audience, and deadline;
- active focus and explicitly paused branches;
- inclusion, exclusion, entity, geographic, and time boundaries;
- information cutoff and required measures, units, currencies, and denominators;
- coverage mode and the known universe or unknown residual;
- supplied files, known sources, required primary sources, and signed-in sites;
- sensitive-data and high-stakes-review restrictions;
- authorized outputs, `#PAGE`, working directory, and delivery order;
- persistent destination, save/reopen probe, purpose-location policy, recovery
  manifest, archive cadence, and capacity reserve;
- health-check branch, scheduler timezone when applicable, Project lease,
  status cadence, and `#LAZY` recovery actions;
- exact assigned models and collaboration requirement;
- project-enabled `#TOOL` allowlist, if any;
- owner-only decisions, retry budgets, status cadence, and stopping conditions; and
- deliverables with evidence-backed acceptance tests.

Ask only questions that materially change those controls. A conservative
assumption may resolve a nonmaterial omission when it is recorded and easy to
reverse. Never invent the topic, permission, model, destination, or completion
criterion.

## PROJECT-002 — Apply the operating boundary

The project uses the `#AGENT` browser-only default. An existing cloud-computer
tool is available only when the Project Control Packet names the tool, exact
operation, allowed inputs and outputs, and approval reference. Project approval
does not permit installation, Codex, a coding project, the owner's computer,
an unassigned model, or access-control bypass.

The configured collaborator and ordered fallbacks are the only assigned
models. Verify visible model and effort selection before every required model
interaction. Advance only when the current configuration is no longer
accessible, and follow the exact order in `config.json`. If the list is
exhausted, pause the dependent branch and ask the owner.

## PROJECT-003 — Workspace and artifacts

Use `/workspace/scratch/<project-id>/` only after the `#AGENT` preflight verifies
it. Organize working artifacts by function:

```text
<project-id>/
├── control/
├── evidence/
├── records/
├── working/
└── deliverables/
```

This layout is disposable working state, not a durability guarantee. Apply
`#STORAGE`: verify the persistent destination before substantive work, record
artifacts and integrity evidence in the recovery manifest, and create an
immutable Research ZIP successor for every completed batch or interruption
checkpoint. A functional `agent:<term>` WIP location never replaces the
approved delivery destination. Deliver through the configured `#PAGE` or
another approved route and perform readback verification.

## PROJECT-004 — Decompose the work

Create a question matrix and dependency-ordered modules. Each module must state
its exact question, scope, inputs, primary-source strategy, required fields,
validation, likely gaps, dependencies, finite next action, and stopping
condition. Keep one active focus. Do not allow a convenient source or new lead
to expand the project silently.

Choose the applicable research mode: `METHOD_ONLY`, `TARGETED_LOOKUP`,
`EVIDENCE_SYNTHESIS`, `BOUNDED_CENSUS`, `OPEN_UNIVERSE_DISCOVERY`, or
`UPDATE_MONITOR`. `METHOD_ONLY` uses supplied material and produces no claimed
external findings.

## PROJECT-005 — Maintain recoverable state

At initialization and after every research batch, material amendment, blocker,
health check, `#LAZY` recovery action, review event, delivery, pause, or
scheduled handoff, persist and read back:

- the Project Control Packet;
- Research State Packet;
- current rule and supersession table;
- artifact map and record versions;
- destination registry, recovery-manifest version, archive lineage, capacity
  and upload-intent state;
- health-check log, schedule or event-driven branch, Project lease, and actual
  progress classification;
- acceptance matrix;
- blockers and unresolved side effects; and
- checkpoint with the next finite action.

Conversation memory, the VM, browser state, and a Page are not substitutes for
verified persistent records. On resume, reopen the latest recovery manifest
and dependencies, then reconcile owner instruction, packet, checkpoint,
artifact versions, schedule, browser/account state, and actual external state.
Identify unrecoverable post-checkpoint work; do not restart completed work or
assume an expired permission remains valid.

## PROJECT-006 — Changes and branches

Classify new owner input as a new project, addendum, correction, supersession,
temporary focus, permission change, question, or status request. Preserve the
exact instruction as provenance. Replace a corrected active rule in its stated
scope while retaining the earlier rule as superseded.

Advance only the active branch. A paused branch requires its recorded resume
trigger or a new explicit owner instruction.

## PROJECT-007 — Progress and completion

Measure progress against deliverables, persistent outputs, and frozen
denominators, not query count, elapsed time, URLs, open tabs, repeated status,
or document volume. Apply `#PROGRESS`; an unsaved output cannot establish
progress or clear `#LAZY`. Classify each acceptance test as
`NOT_RUN`, `PASS`, `FAIL`, `BLOCKED`, or `WAIVED_BY_OWNER`, with evidence IDs.

Stop when every selected case has a supported result or bounded documented
gap, required contradiction and fact-check work is complete, acceptance tests
are terminal, artifacts and inputs are persistently verified and registered,
the final Research archive is read back, artifacts are delivered and read
back, the project monitor is disabled, and remaining uncertainty is disclosed.
Use `COMPLETE_WITH_GAPS` when the agreed deliverable is complete
but bounded evidence gaps remain. Never call an open universe exhaustive.

## PROJECT-008 — Handoff ingestion and authority

Before using a supplied archive, prior-project package, prompt history, or
advisory response, inventory every artifact and classify each instruction or
record as a portable rule, project parameter, dated observation, research
evidence, advisory output, superseded instruction, unsafe instruction, or
duplicate. Record the classification, controlling authority, applicable scope,
canonical destination, and keep/drop decision. Do not publish or preserve a
second live instruction source after its accepted content has been reconciled.

For a tagged DOT release, produce an ingestion receipt before project work. It
must record the declared release, prior release when supplied, baseline,
entrypoint, every required and conditional instruction file found, missing or
truncated content, manifest hashes, which hashes were actually verified,
authority classifications, and
non-instructional paths. Never claim digest verification without an authorized
surface that performed it. A release mismatch, incomplete required file, or
unresolved authority conflict blocks activation of the affected contract.

Keep exact originals, topic-neutral adaptations, and model-generated advice as
distinct provenance classes. An adaptation is not a quotation; an advisory is
not evidence; a historical active-state label is not current authority. Files,
accounts, permissions, models, tools, destinations, and observed capabilities
from the prior project never transfer automatically. Apply the current
authority order, reject unsafe or obsolete directions, preserve scoped
supersession, and carry forward only the material supported by the current
Project Control Packet.

## PROJECT-009 — Control conditional deliverables

Activate an optional research deliverable only when the owner requests its
named output and the Project Control Packet records its scope, parent project
version, evidence cutoff, inputs, destination, acceptance tests, and delivery
order. Give each activation its own request ID and artifact ID. Do not infer a
request for adjacent deliverables or allow a derivative output to overwrite its
parent report or an accepted data release.

Use `#SUMMARY` for an on-demand subtopic executive brief that starts from
existing research and completes its required material Facts inside the approved
Project boundary. Record the immutable parent evidence and data versions, then
route missing Facts back through `#INTERNET` and applicable `#DATA` before
freezing the final versions used for drafting. New evidence may create a linked
supplement, successor dataset release, or proposed correction set; it never
mutates the parent report or an accepted release.

If the requested output materially expands the question, population,
geography, period, evidence universe, permission, or destination, classify and
approve that change under PROJECT-006 before continuing. Complete the
deliverable only when its Fact matrix, separate acceptance tests, publication
receipt, and readback are terminal.